Skip to main content
Back to time machine

Cline

Tracked across 39 snapshots (2025-12-092026-06-12).

Latest rating
65
Rating delta
+1
Latest signal
Tracked
Tracked
Caps now applied
0

Rating timeline

02550751002025-12-09 — rating 64, Assessed2025-12-11 — rating 64, Assessed2025-12-19 — rating 64, Assessed2025-12-28 — rating 64, Assessed2026-01-05 — rating 64, no level2026-01-06 — rating 64, Assessed2026-01-09 — rating 49, Assessed2026-01-12 — rating 64, Tracked2026-01-13 — rating 64, Tracked2026-01-15 — rating 64, Detected2026-01-27 — rating 64, Detected2026-02-02 — rating 66, Detected2026-02-03 — rating 66, Detected2026-02-06 — rating 67, Detected2026-02-07 — rating 67, Detected2026-02-09 — rating 67, Detected2026-02-18 — rating 70, Detected2026-02-19 — rating 70, Detected2026-02-22 — rating 70, Detected2026-02-23 — rating 70, Detected2026-02-26 — rating 72, Detected2026-03-02 — rating 72, Detected2026-03-07 — rating 72, Detected2026-03-08 — rating 72, Detected2026-03-12 — rating 72, Detected2026-03-30 — rating 72, Detected2026-04-07 — rating 72, Detected2026-04-09 — rating 73, Detected2026-04-10 — rating 73, Detected2026-04-20 — rating 73, Tracked2026-04-21 — rating 73, Tracked2026-04-30 — rating 73, Tracked2026-05-04 — rating 61, Tracked2026-05-05 — rating 73, Tracked2026-05-16 — rating 73, Tracked2026-05-18 — rating 73, Tracked2026-05-28 — rating 73, Tracked2026-06-10 — rating 65, Tracked2026-06-12 — rating 65, Tracked2025-12-092026-02-232026-06-12

Dimension trajectory

Autonomy

15/20
2002025-12-09 — 17/202025-12-11 — 17/202025-12-19 — 17/202025-12-28 — 17/202026-01-05 — 17/202026-01-06 — 17/202026-01-09 — 13/202026-01-12 — 15/202026-01-13 — 15/202026-01-15 — 15/202026-01-27 — 15/202026-02-02 — 17/202026-02-03 — 17/202026-02-06 — 17/202026-02-07 — 17/202026-02-09 — 17/202026-02-18 — 17/202026-02-19 — 17/202026-02-22 — 17/202026-02-23 — 17/202026-02-26 — 17/202026-03-02 — 17/202026-03-07 — 17/202026-03-08 — 17/202026-03-12 — 17/202026-03-30 — 17/202026-04-07 — 17/202026-04-09 — 17/202026-04-10 — 17/202026-04-20 — 17/202026-04-21 — 17/202026-04-30 — 17/202026-05-04 — 17/202026-05-05 — 17/202026-05-16 — 17/202026-05-18 — 17/202026-05-28 — 17/202026-06-10 — 15/202026-06-12 — 15/20

Integration

12/20
2002025-12-09 — 10/202025-12-11 — 10/202025-12-19 — 10/202025-12-28 — 10/202026-01-05 — 10/202026-01-06 — 10/202026-01-09 — 7/202026-01-12 — 11/202026-01-13 — 11/202026-01-15 — 11/202026-01-27 — 11/202026-02-02 — 13/202026-02-03 — 13/202026-02-06 — 13/202026-02-07 — 13/202026-02-09 — 13/202026-02-18 — 13/202026-02-19 — 13/202026-02-22 — 13/202026-02-23 — 13/202026-02-26 — 13/202026-03-02 — 13/202026-03-07 — 13/202026-03-08 — 13/202026-03-12 — 13/202026-03-30 — 13/202026-04-07 — 13/202026-04-09 — 13/202026-04-10 — 13/202026-04-20 — 14/202026-04-21 — 14/202026-04-30 — 14/202026-05-04 — 13/202026-05-05 — 13/202026-05-16 — 14/202026-05-18 — 14/202026-05-28 — 14/202026-06-10 — 12/202026-06-12 — 12/20

Context

12/20
2002025-12-09 — 14/202025-12-11 — 14/202025-12-19 — 14/202025-12-28 — 14/202026-01-05 — 14/202026-01-06 — 14/202026-01-09 — 11/202026-01-12 — 14/202026-01-13 — 14/202026-01-15 — 14/202026-01-27 — 14/202026-02-02 — 14/202026-02-03 — 14/202026-02-06 — 14/202026-02-07 — 14/202026-02-09 — 14/202026-02-18 — 14/202026-02-19 — 14/202026-02-22 — 14/202026-02-23 — 14/202026-02-26 — 14/202026-03-02 — 14/202026-03-07 — 14/202026-03-08 — 14/202026-03-12 — 14/202026-03-30 — 14/202026-04-07 — 14/202026-04-09 — 14/202026-04-10 — 14/202026-04-20 — 14/202026-04-21 — 14/202026-04-30 — 14/202026-05-04 — 14/202026-05-05 — 14/202026-05-16 — 14/202026-05-18 — 14/202026-05-28 — 14/202026-06-10 — 12/202026-06-12 — 12/20

Compliance

10/20
2002025-12-09 — 7/202025-12-11 — 7/202025-12-19 — 7/202025-12-28 — 7/202026-01-05 — 7/202026-01-06 — 7/202026-01-09 — 6/202026-01-12 — 10/202026-01-13 — 10/202026-01-15 — 10/202026-01-27 — 10/202026-02-02 — 7/202026-02-03 — 7/202026-02-06 — 8/202026-02-07 — 8/202026-02-09 — 8/202026-02-18 — 9/202026-02-19 — 9/202026-02-22 — 9/202026-02-23 — 9/202026-02-26 — 11/202026-03-02 — 11/202026-03-07 — 11/202026-03-08 — 11/202026-03-12 — 11/202026-03-30 — 11/202026-04-07 — 11/202026-04-09 — 12/202026-04-10 — 12/202026-04-20 — 11/202026-04-21 — 11/202026-04-30 — 11/202026-05-04 — 12/202026-05-05 — 12/202026-05-16 — 12/202026-05-18 — 12/202026-05-28 — 12/202026-06-10 — 10/202026-06-12 — 10/20

Viability

13/20
2002026-04-20 — 14/202026-04-21 — 14/202026-04-30 — 14/202026-05-04 — 0/202026-05-16 — 13/202026-05-18 — 13/202026-05-28 — 13/202026-06-10 — 13/202026-06-12 — 13/20

Interface

16/20
2002025-12-09 — 16/202025-12-11 — 16/202025-12-19 — 16/202025-12-28 — 16/202026-01-05 — 16/202026-01-06 — 16/202026-01-09 — 12/202026-01-12 — 14/202026-01-13 — 14/202026-01-15 — 14/202026-01-27 — 14/202026-02-02 — 15/202026-02-03 — 15/202026-02-06 — 15/202026-02-07 — 15/202026-02-09 — 15/202026-02-18 — 17/202026-02-19 — 17/202026-02-22 — 17/202026-02-23 — 17/202026-02-26 — 17/202026-03-02 — 17/202026-03-07 — 17/202026-03-08 — 17/202026-03-12 — 17/202026-03-30 — 17/202026-04-07 — 17/202026-04-09 — 17/202026-04-10 — 17/202026-04-20 — 17/202026-04-21 — 17/202026-04-30 — 17/202026-05-04 — 17/202026-05-05 — 17/202026-05-16 — 17/202026-05-18 — 17/202026-05-28 — 17/202026-06-10 — 16/202026-06-12 — 16/20

Cap timeline

Q1 26Q2 26acquisition-uncertaintyacquisition-uncertainty: 2026-02-18 → 2026-04-07

Notable events

  • 2026-01-05SignalAssessed → —
  • 2026-01-06Signal— → Assessed
  • 2026-01-09Drop-15 rating
  • 2026-01-12SignalAssessed → Tracked
  • 2026-01-12Jump+15 rating
  • 2026-01-15SignalTracked → Detected
  • 2026-02-18Cap +acquisition-uncertainty
  • 2026-04-09Cap −acquisition-uncertainty
  • 2026-04-20SignalDetected → Tracked
  • 2026-05-04Drop-12 rating
  • 2026-05-05Jump+12 rating
  • 2026-06-10Drop-8 rating

What would move this next

Upgrade to Assessed if: SOC 2 Type II / ISO 27001 obtained (primary trigger); OR direct hands-on or third-party evaluation evidence accrues; OR independent third-party benchmark validates the Terminal-Bench claims; OR @cline/sdk adoption demonstrated outside Cline (external products building on the runtime); AND 90+ days without a further critical CVE. Downgrade to Detected if: a fourth serious security event in <12 months; IDE-extension SDK migration stalls; enterprise references (Oracle NetSuite SDA) retract; or community fragments post-Roo-consolidation.

Cline — history | Agentic Developer Tools Radar · Signal